Renova Interiors LtdWhatsApp 07491 365 562
Recent work

Properties turned around.

Each job is listed with the scope actually carried out and the checks completed at handover. Client names and full addresses are withheld as a matter of course.

Two-bedroom flat, Dagenham

TypeVoid & re-let
Areas6
CompletedSeptember 2026
Scope of works
AreaWorks carried out
EntranceFront door locks changed, new keys left on site
HallwayLeftover items disposed of, walls, ceiling and woodwork cleaned
Living roomHairline cracks filled, walls painted, new light switch fitted, curtains refitted
KitchenUnits, oven, extractor and appliances degreased inside and out, freezer defrosted
Bedrooms 1–2Walls, ceilings, woodwork, sockets and frames deep cleaned, curtains washed and refitted
BathroomTiles and grouting cleaned, toilet descaled, taps and frames cleaned
Handover

Smoke alarm tested and confirmed interlinked with the heat detector. CO alarm and fire blanket checked. Heating and hot water tested and left in working order. Property cleaned throughout and handed back ready for re-let.

Before: Living room window while the hairline cracks were filled
Before Living room window while the hairline cracks were filled
Before: Bedroom before the deep clean
Before Bedroom before the deep clean
Before: Hallway threshold before the clean
Before Hallway threshold before the clean
After: Living room, walls painted and cleaned for re-let
After Living room, walls painted and cleaned for re-let
After: Kitchen units, worktop and floor deep cleaned
After Kitchen units, worktop and floor deep cleaned
After: Bathroom descaled, tiles and grouting cleaned
After Bathroom descaled, tiles and grouting cleaned
After: Bedroom cleaned, curtains washed and refitted
After Bedroom cleaned, curtains washed and refitted
After: Oven degreased inside and out
After Oven degreased inside and out
After: Front door lock changed
After Front door lock changed
Earlier work by our team

Where the standard comes from.

Bathrooms, tiling, refits and redecoration carried out by members of the Renova team before the company was incorporated in 2026.

Bathroom retile, before
Before
Bathroom retile, after
After

Bathroom retile

Damaged tiling stripped back around a corner bath and replaced.

Shower enclosure, before
Before
Shower enclosure, after
After

Shower enclosure

Walls tiled floor to ceiling around a new shower tray.

Room refit, before
Before
Room refit, after
After

Room refit

Ceiling stripped and rebuilt, walls tiled and a new floor laid.

Redecoration, before
Before
Redecoration, after
After

Redecoration

Walls and woodwork prepared and repainted throughout.

Send us the job sheet.

Forward the schedule or give us the address and we will attend, measure and return an itemised written quotation within 48 hours. No obligation, and no charge for the survey.

Telephone07491 365 562
Service areaEast London & Essex
HoursMon–Sat, 07:30–18:00
Company17386661
WhatsApp